One-page reference: the BS.1770 four-step measurement pipeline, the EBU R128 / ATSC A/85 targets and ceilings side by side, the LUFS-vs-LKFS note, and the normalize-then-limit order rule.
Within 24 hours you get a realistic estimate, technical recommendations and next steps. Free, no obligations.
01
A senior architect reads itReply the same business day, Mon–Fri.
02
30-min call to scope itWe ask the questions that change the budget.
03
Estimate in 24 hoursBudget, timeline, architecture notes. Yours to keep.
Got it — your message is in. A real engineer will reply within 24 hours with a realistic estimate and next steps. Check your inbox (and spam, just in case).
Hmm — that didn’t go through. Please try again. If the issue keeps happening, email us at eager2develop@forasoft.com and a real engineer will pick it up.