One-page printable worksheet with the build-vs-buy decision tree, the six-stage pipeline checklist, the three-failure-mode audit, and the per-minute cost arithmetic. Use it at project kickoff to scope an OTT archive upscaling project, pick the model and vendor, and budget GPU and engineering time.
Download free PDF